Required Inspections and Current Building Codes
Inspection requests can be e-mailed to inspections@cityofpellcity.net at least 24-hours advance notice.
- Site Inspection
- Temporary Power
- Footing Inspection
- Poured Wall
- Slab Plumbing Inspection
- Slab Prep Inspection
- Rough Inspections
- Framing
- Electrical
- Plumbing & Gas
- HVAC
- Temporary to Permanent Power
- Final Inspections
- Electrical
- Plumbing & Gas
- HVAC
- General Construction
- Erosion control such as sod or seed and hay must be in place before a C/O is issued
All failed inspections will result in re-inspection fees which must be paid before a final inspection is scheduled.
State Building Code
- 2021 International Existing Building Code
- 2021 International Plumbing Code
- 2021 International Mechanical Code
- 2021 International Fuel Gas Code
- 2021 International Fire Code
- 2021 National Electrical Code (NFPA 70
- 2021 National Fire Alarm and Signaling Code (NFPA 72)
- 2021 ICC/NSSA-500 Standard for the Design and Construction of Storm Shelters
- ANSI/ASHRAE/IESNA Standard 90.1-2013 Energy Standard for Buildings Except Low-Rise Residential
- 2021 ADA Standards for Accessible Design.